大化水电站发电机的增容改造
引用本文:聂启蓉.大化水电站发电机的增容改造[J].红水河,2000,19(1):57-60.
作者姓名:聂启蓉
作者单位:广西电力工业勘察设计研究院!广西南宁530023
摘    要:大化水电站通过更换发电机定子铁芯和线圈并配合水轮机增容实现机组增容改造。改造后的定子采用了新结构,新工艺。在额定转速、额定电压和额定功率因数不变的条件下,发电机的额定出力由原来的100MW提高至114MW。

关 键 词:发电机  增容改造  水电站
文章编号:1001-408X(2000)01-0057-04
修稿时间:1999-04-19

Modification of Capacity Increment for Generator of Dahua Hydropower Station
NIE Qi_rong.Modification of Capacity Increment for Generator of Dahua Hydropower Station[J].Hongshui River,2000,19(1):57-60.
Authors:NIE Qi_rong
Abstract:Modification of capacity increment for generating set of Dahua hydropower station achieved by replacing core, coil of stator and increasing the turbine capacity. The new structure and new technique had been apllied to the new stator. And the rated output of generator would be increased from 100 MW to 114 MW under the condition that rated speed, rated voltage and rated power factor were not changed.
Keywords:generator  modification of capacity increment  rated output  Dahua hydropower station  