首页 | 本学科首页   官方微博 | 高级检索  
     


Improvement of nitrogen removal at WWTP Zürich Werdh?elzli after connection of WWTP Zürich-Glatt.
Authors:H Siegrist  L Rieger  Ch Fux  M Wehrli
Affiliation:EAWAG, CH-8600 Dübendorf, Switzerland.
Abstract:Optimisation of nitrifying activated sludge plants towards nutrient removal (denitrification and enhanced P-removal) leads to a substantial reduction of operating costs and improves effluent and operating conditions. At WWTP Zürich-Werdh?elzli, initially designed for nitrification only, an anoxic zone of 28% of total activated sludge volume was installed and allowed 60% nitrogen elimination besides several other optimisations. In 2001 the operation of WWTP Zürich-Glatt was stopped and the wastewater was connected to WWTP Werdh?elzli. To improve nitrogen removal, WWTP Werdh?elzli co-financed two research projects; one for separate digester supernatant treatment with the anammox process operating two SBRs in series and the other applying NH4 sensors for aeration control in order to decrease energy consumption and raise effluent quality. The results of both projects and the consequences for WWTP Werdh?elzli are discussed in this paper.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号