首页 | 本学科首页   官方微博 | 高级检索  
     

公伯峡水电站料场规划管理与坝体填筑
引用本文:尹红东,张向东.公伯峡水电站料场规划管理与坝体填筑[J].水力发电,2004,30(8):51-53.
作者姓名:尹红东  张向东
作者单位:中国水利水电第四工程局,青海,西宁,810007
摘    要:公伯峡水电站混凝土面板堆石坝工程为寒冷地区施工的高面板坝,坝址处河床狭窄,地质构造较为复杂,因此做好料场的规划与管理工作,对坝体填筑施工的顺利进行起着尤为重要的作用;另外,合理的道路规划、布置,也是坝体填筑施工的关键因素。公伯峡水电站工程混凝土面板堆石坝料场的规划管理与坝体填筑施工的具体措施及取料的施工要求,可为同类工程施工所借鉴。

关 键 词:料场规划管理  坝体填筑  公伯峡水电站
文章编号:0559-9342(2004)08-0051-03

Planning and management of construction materials field and the filling of dam body of the Gongboxia Hydropower Station
Ying Hong dong,Zhang Xiang dong.Planning and management of construction materials field and the filling of dam body of the Gongboxia Hydropower Station[J].Water Power,2004,30(8):51-53.
Authors:Ying Hong dong  Zhang Xiang dong
Abstract:Gongboxia Dam project is located in upstream Yellow river where with an elevation of 2,000 meters and low temperature all the year. It's so important to make a good plan of backfill stuff site for successfully construction because of the narrow landform on site. In this paper, the methods of dam backfill were also introduced in details.
Keywords:planning and management of construction materials field  filling of dam body  Gongboxia Hydropower Station
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号