钢管拱桥下临时桥墩的控制爆破拆除
引用本文:朱金华,陈志阳. 钢管拱桥下临时桥墩的控制爆破拆除[J]. 爆破, 2005, 22(1): 76-79
作者姓名:朱金华  陈志阳
作者单位:国防科学技术大学工程兵学院,湖南,长沙,410072;国防科学技术大学工程兵学院,湖南,长沙,410072
摘    要:论述了高标号钢筋混凝土钢管拱桥临时桥墩的控制爆破拆除方法、爆破参数的选择和防护措施.所取得的成功经验及技术参数可供相似爆破拆除的工程参考.

关 键 词:钢筋混凝土  桥墩  拆除爆破
文章编号:1001-487X(2005)01-0076-04
修稿时间:2004-10-18

Demolition of Provisional Bridge Pier of Steel-tube Arch Bridge by Controlled Blasting
ZHU Jin-hua,CHEN Zhi-yang. Demolition of Provisional Bridge Pier of Steel-tube Arch Bridge by Controlled Blasting[J]. Blasting, 2005, 22(1): 76-79
Authors:ZHU Jin-hua  CHEN Zhi-yang
Abstract:The demolition method , selection of blasting parameters and defending measures in controlled blasting of provisional high-grade reinforced concrete bridge pier of steel-tube arch bridge are discussed. The experience and the technological parameters can be as references for the similar projects of controlled blasting.
Keywords:reinforced concrete  bridge pier  demolition blasting  