首页 | 本学科首页   官方微博 | 高级检索  
     

万家寨电站压力钢管伸缩节改造
引用本文:刘小军,郭文俊. 万家寨电站压力钢管伸缩节改造[J]. 电力学报, 2007, 22(4): 520-522
作者姓名:刘小军  郭文俊
作者单位:万家寨水电站,山西,偏关,036412
基金项目:万家寨水电站技术改造立项项目
摘    要:针对万家寨电站引水压力钢管伸缩节自投产以来存在的问题,分析其漏水原因,处理过程以及改造方案,消除了困扰水电站安全稳定运行的隐患,提高了机组运行可靠性。

关 键 词:压力钢管  伸缩节  结构  改造
文章编号:1005-6548(2007)04-0520-03
收稿时间:2007-10-10
修稿时间:2007-11-27

The Reform of Pressure Pipe''''s Slip Joint in Wanjiazhai Hydropower Station
LIU Xiao-jun,GUO Wen-jun. The Reform of Pressure Pipe''''s Slip Joint in Wanjiazhai Hydropower Station[J]. Journal of Electric Power, 2007, 22(4): 520-522
Authors:LIU Xiao-jun  GUO Wen-jun
Affiliation:Wanjiazhai Hydropower Station, Pianguan 036412, China
Abstract:By taking into consideration the trouble of waterdrawing pressure pipe's slip joint which has existed since the hydropower station commenced operation,this paper analyses the cause of water-leakage,handling procedure and reform scheme,removes the hidden peril which affects the station's safe operation and boosts the reliadility of the generator units.
Keywords:pressure pipe  slip joint  structure  reform
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号