首页 | 本学科首页   官方微博 | 高级检索  
     


Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times
Authors:Mehdi Iranpoor  S.M.T. Fatemi Ghomi  M. Zandieh
Affiliation:1. Department of Industrial Engineering, Amirkabir University of Technology, 424 Hafez Avenue, 1591634311 Tehran, Iran;2. Department of Industrial Management, Management and Accounting Faculty, Shahid Beheshti University, G.C., Tehran, Iran
Abstract:Due date assignment combined with shop floor scheduling has attracted enormous amount of research, in recent years. In many make-to-order situations, the processing times are not known exactly in advance. Further, machine rates are not constant at different times. We assume the case where the machine rate is low at the beginning of the scheduling horizon. However, it can be brought back to normal rate by performing a maintenance activity. The problem includes assigning due-dates and scheduling the jobs and maintenance activity on a single machine where the processing times are stochastic. The objective is minimizing the total cost of lengths of quoted due-dates and expected deviations of completion times from declared due-dates. The optimal solutions of medium-sized problems are found by solving some nonlinear programming models. For larger problems, robust metaheuristics are developed and their performances are statistically analyzed.
Keywords:Due-date assignment   Stochastic processing times   Maintenance activity   Nonlinear programming   Robust metaheuristics
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号