首页 | 本学科首页   官方微博 | 高级检索  
     

煤矿暗井变频绞车二级制动改造
引用本文:李新梅,胡兆瑞.煤矿暗井变频绞车二级制动改造[J].煤矿机械,2010,31(10).
作者姓名:李新梅  胡兆瑞
作者单位:1. 七台河职业学院,黑龙江,七台河,154600
2. 黑龙江省七台河市东风煤矿,黑龙江,七台河,154600
摘    要:该项改造通过外加UPS电源解决了该型变频绞车由于没有二级制动而引起的紧急制动时出现的松绳等严重问题,重新调定了几个参数,修改了PLC程序和电器接线,使其最大制动力矩和制动减速度符合《煤矿安全规程》规定。该改造在七台河市多家煤矿推广。

关 键 词:二级制动  松绳  PLC程序参数  贴压

Two Stage Braking Alteration for Frequency Conversion Winch Working in Underground Coal Mines
LI Xin-mei,HU Zhao-rui.Two Stage Braking Alteration for Frequency Conversion Winch Working in Underground Coal Mines[J].Coal Mine Machinery,2010,31(10).
Authors:LI Xin-mei  HU Zhao-rui
Abstract:This alteration,through to add an extra UPS,mainly to solve the "rope slack" problem when a frequency conversion winch which no two stage braking and working in underground coal mines is peremptorily broken;to re-setup many parameter values,to chage the parameters of PLC programs,to change many modes of connection of some electrical components,and then to let its max.Brake Torque and brake retarded velocity be up to the mustard of safety regulations in coal mine.This alteration has been deploied in many coal mines in Qitaihe.
Keywords:two stage braking  rope slack  the parameter of PLC programs  oil pressure when the presure is zero
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号