Administration Progress of HI-13 Tandem Accelerator Upgrading Project in 2005 |
| |
引用本文: | CAO Xiao-ping SUN Yang YANG Bing-fan. Administration Progress of HI-13 Tandem Accelerator Upgrading Project in 2005[J]. 中国原子能科学研究院年报, 2005, 0(1): 43-44 |
| |
作者姓名: | CAO Xiao-ping SUN Yang YANG Bing-fan |
| |
摘 要: | The HI-13 Tandem Accelerator Upgrading Project, also known as Beijing Radioactive Ion-beam Facility (BRIF), is an important construction project in the country. The year of 2005 is a very significant year for the project preliminary design. During this year, the preliminary design would be completed basically, and the preparation for the design evaluation and the architecture construct were also initiated in the same time.
|
关 键 词: | HI-13串列加速器 回旋加速器 升级工程 工程管理 |