首页 | 本学科首页   官方微博 | 高级检索  
     

嫩江白沙滩险工护岸工程设计
引用本文:黄俊,田伟峰,李佩南,王禹. 嫩江白沙滩险工护岸工程设计[J]. 东北水利水电, 2012, 30(10): 1-2,14,71
作者姓名:黄俊  田伟峰  李佩南  王禹
作者单位:1. 中水东北勘测设计研究有限责任公司,吉林长春,130021
2. 中国水利水电第二工程局有限公司,北京,100120
摘    要:白沙滩险工段处于嫩江主流凹岸顶流冲刷区,陡岸岩性主要是细砂,平均每年以2m的速度坍塌退岸,针对运行期不同设计水位等条件分别采取不同护坡、护岸型式,通过工程实施,取得了在粉细砂基础上进行坡式护岸设计的成功经验.

关 键 词:险工护岸  模袋混凝土  软体沉排  嫩江白沙滩

Design of revetment engineering for Baishatan critical levee section of Nenjiang river
Affiliation:HUANG Jun,TIAN Wei-feng,LI Pei-nan
Abstract:The Baishantan critical levee section is located in Nenjiang river master stream concave bank erosion area.The main lithology of steep bank is fine sand,and then the average collapse speed of bank reached 2m per year.The different types of slope protection and bank protection are adopted respectively according to different design water level in operation period,which gets successful experience of the slope type design on the fine sand foundation revetment by through the project implementation.
Keywords:revetment in critical levee section  bag concrete  soft sinking mattress  Baishatan of Nenjiang river
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号