首页 | 本学科首页   官方微博 | 高级检索  
     

东海煤矿锚杆及注浆支护模拟
引用本文:金珠鹏,孙广义.东海煤矿锚杆及注浆支护模拟[J].中国矿业,2012,21(5):99-100.
作者姓名:金珠鹏  孙广义
作者单位:黑龙江科技学院资源与环境工程学院,黑龙江哈尔滨,150027
摘    要:以鸡西东海煤矿实测数据为基础,采用实验测量与数值模拟相结合的方式对东海煤矿弧形底角锚杆数量进行模拟同时模拟研究巷道围岩在注浆前后,巷道围岩应力分布情况,分析研究巷道围岩注浆后应力变化。通过模拟结果找出减小底角处由应力集中所造成的损害和增加底角围岩自身的承载能力的有效方法。

关 键 词:数值模拟  锚杆  注浆  模型

A Simulation of Bolting and Grouting Support for Donghai Coal Mine
JIN Zhu-peng,SUN Guang-yi.A Simulation of Bolting and Grouting Support for Donghai Coal Mine[J].China Mining Magazine,2012,21(5):99-100.
Authors:JIN Zhu-peng  SUN Guang-yi
Affiliation:(College of Resources and Environment Engineering,Heilongjiang Institute of Science and Technology,Harbin 150027,China)
Abstract:This paper is based on the real data of Donghai Coal Mine in Jixi.Combining the experimental measurements and numerical simulations,we simulate not only the number of bolting in arc-shaped bottom of Donghai Coal Mine but also the distribution of surrounding rock stress both before and after grouting the roadway,and furthermore,we analyze the stress changes of roadway surrounding rocks after grouting.What’s more,we are dedicated to finding out the effective way to reduce the corner damages resulted from the concentration of bottom stress and to increase the carrying capacity of the bottom surrounding rocks.
Keywords:numerical simulation  anchor bolt  grouting  model
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《中国矿业》浏览原始摘要信息
点击此处可从《中国矿业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号