首页 | 本学科首页   官方微博 | 高级检索  
     

影响安塞油田长6层堵水压裂效果因素探讨
引用本文:王玉功,;刘镕菖,;李勇,;杨博丽,;王小文,;唐冬珠,;汪小宇,;王所良. 影响安塞油田长6层堵水压裂效果因素探讨[J]. 石油化工高等学校学报, 2014, 0(4): 61-65
作者姓名:王玉功,  刘镕菖,  李勇,  杨博丽,  王小文,  唐冬珠,  汪小宇,  王所良
作者单位:[1]川庆钻探钻采工程技术研究院,陕西西安710018; [2]低渗透油气田勘探开发国家工程实验室,陕西西安710018; [3]西南石油大学地球科学与技术学院,四川成都610500; [4]川庆钻探工程有限公司长庆井下技术作业公司,陕西西安710018
基金项目:中石油集团川庆钻探科技攻关项目“长庆低渗储层中温堵水技术研究”(2011-25).
摘    要:从安塞油田长6层储层特点、开发现状及堵水压裂技术特点等方面,对影响安塞油田长6层堵水压裂效果的关键因素进行探讨。分析认为,油井储层见水特征、油层纵向层间非均质性、前期压裂改造状况都对堵水压裂效果产生深远影响,选择合适的堵水压裂层位是取得良好降液增产效果的前提和基础。另外,堵水、压裂两种措施间的相互影响也部分降低了最终的堵水和压裂施工效果,因此,选择合适的井层和优化堵水-压裂施工程序成为提高安塞油田长6层堵水压裂效果的技术关键。

关 键 词:堵水压裂  影响因素  选井选层  施工程序优化

Discussion on Influencing Factors for Plugging and Fracturing in Ch6 Reservoir,Ansai Oilfield
Wang Yugong;Liu Rongchang;Li Yong;Yang Boli;Wang Xiaowen;Tang Dongzhu;Wang Xiaoyu;Wang Suoliang. Discussion on Influencing Factors for Plugging and Fracturing in Ch6 Reservoir,Ansai Oilfield[J]. Journal of Petrochemical Universities, 2014, 0(4): 61-65
Authors:Wang Yugong  Liu Rongchang  Li Yong  Yang Boli  Wang Xiaowen  Tang Dongzhu  Wang Xiaoyu  Wang Suoliang
Affiliation:Wang Yugong , Liu Rongchang , Li Yong , Yang Boli , Wang Xiaowen , Tang Dongzhu , Wang Xiaoyu , Wang Suoliang (1.Technology g Engineering Research Institute of Chuanqing Drilling Engineering Company, Xi ' an Shaanxi 710018,China ;2.National Engineering Laboratory for Exploration and Development of Low-Permeability Oil & Gas Fields, Xi ' an Shaanxi 710018,China; 3.School of Geoscience and Technology, Southwest Petroleum University, Chengdu Sichuan 610500,China 4.Changqing Down Hole Operation Company, CNPC Chuanqing Drilling Engineering Company Limited, Xi 'an Shaanxi 710018, China )
Abstract:Key factors influencing the effect of plugging and fracturing was discussed, in respect to the characteristics and development status of Ch6 reservoir in Ansai oilfield, as well as features of the plugging and fracturing technology. The results showed that water breakthrough, vertical interlayer heterogeneity and initial fracturing treatment may significantly affect the plugging and fracturing performance. So, appreciate horizon for plugging and fracturing was the prerequisite for effectively reducing fluid leakage and enhancing recovery. The interaction between plugging and fracturing may also partially debase the treatment effects. Therefore, selection of proper well/layer and optimization of treatment procedure were essential for improving the plugging and fracturing effects of Ch6 reservoir, Ansai oilfield.
Keywords:Plugging and fracturing  Influencing factors  Well/layer selection  Optimization of treatment procedure
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号