永宁河四级水电站软弱基岩的竖井开挖施工
引用本文:李佳宁.永宁河四级水电站软弱基岩的竖井开挖施工[J].中国农村水电及电气化,2013(11):5-8,55.
作者姓名:李佳宁
作者单位:中国水利水电第五工程局有限公司,成都610066
摘    要:竖井开挖是水电站中常见的施工项目,在软弱基岩上开挖竖井尤其不易。本文结合永宁河四级水电站调压井围岩状况及施工布置,综合阐述了竖井在软弱基岩地质条件下的开挖及支护施工方案,可作为类似竖井工程施工的借鉴。

关 键 词:永宁河四级水电站  竖井  软弱地质  开挖  支护

Excavation Construction of Vertical Shaft on Soft Bedrock of Yongning River Level 4 Hydropower Station
LI Jia-ning.Excavation Construction of Vertical Shaft on Soft Bedrock of Yongning River Level 4 Hydropower Station[J].Rural Hydropower & Electrification in China,2013(11):5-8,55.
Authors:LI Jia-ning
Affiliation:LI Jia-ning ( SinoHydro Bureau 5 Co., Ltd., Chengdu 610066, China)
Abstract:Shaft excavation is the normal construction project in hydropower stations, and the shaft excavation in weak basement is especially difficuh. Combining the surge shaft surrounding rock situations and construction arrangement in Yongning River Level 4 Hydropower Station, the excavation and support construction plan of the shaft under weak basement conditions is elaborated comprehensively in this paper in a bid to provide the reference for similar shaft project construction.
Keywords:Yongning River Level 4 Hydropower Station  shaft  weak geology  excavation  support