右江水电厂2~#机组上导轴承摆度不规则原因分析及临时处理措施
引用本文:吕油库,覃举宋.右江水电厂2~#机组上导轴承摆度不规则原因分析及临时处理措施[J].广西水利水电,2010(5):43-46,50.
作者姓名:吕油库  覃举宋
作者单位:[1]广西大学,广西南宁530001 [2]广西右江水利开发有限责任公司,广西南宁530022
摘    要:通过对广西百色右江水力发电厂2#机组上导轴承摆度出现不规则进行观察和分析,发现上导滑转子与顶轴轴身发生了相对周向移动致使上导轴承摆度不规则。采取对上导滑转子现场热套加垫的临时处理方法,通过电磁加热使上导滑转子膨胀后加不锈钢垫片,以增大顶轴与滑转子间的摩擦力。经现场热套处理,2#机组上导滑轴承摆度恢复正常。

关 键 词:顶轴  滑转子  摆度  盘车  调整间隙

Upper guide bearing abnormal run-out analysis and temporary treatment for No.2 unit of Youjiang HPP
LV You-ku,QIN Ju-song.Upper guide bearing abnormal run-out analysis and temporary treatment for No.2 unit of Youjiang HPP[J].Gx Water Resources & Hydropower Engineering,2010(5):43-46,50.
Authors:LV You-ku  QIN Ju-song
Affiliation:1.Guangxi University,Nanning 530001,China;2.Guangxi Youjiang Water and Power Development Ltd Corp.,Nanning 530022,China)
Abstract:The upper guide bearing of No.2 unit of Youjiang Hydropower Plant had seen abnormal run-out.According to observation and analysis,it was found that it was caused by circumferential displacement of bearing collar.The temporary treatment measure adopted is expanding the bearing collar by electromagnetic heating, then inserting stainless steel gasket,so as to increase the friction force.The bearing run-out of No.2 unit restore regular state after the treatment.
Keywords:Shaft  bearing collar  run-out  rotate shaft  gap adjustment