黏土中隧道开挖引起的地表及地表以下土体长期 沉降计算方法
引用本文:杨敏,黄炬,孙庆,刘侃,曾英俊. 黏土中隧道开挖引起的地表及地表以下土体长期 沉降计算方法[J]. 岩土工程学报, 2012, 34(2): 217-221
作者姓名:杨敏  黄炬  孙庆  刘侃  曾英俊
作者单位:1. 同济大学岩土及地下工程教育部重点实验室,上海 200092; 2. 同济大学地下建筑与工程系,上海 200092; 3. 中国建筑第三工程局有限公司技术中心,湖北 武汉 430070; 4. 上海市第二市政工程有限公司,上海 200065
摘    要:基于 Mair 提出的隧道开挖引起的土体瞬时沉降的理论以及进行的有限元数值模拟结果,推出地表及地表以下不同深度土体长期沉降的计算方法。首先模拟了 Ong 的离心机试验以验证数值模型的合理性,然后对隧道开挖引起的不同深度处土体长期沉降问题进行了模拟研究,建立了长期和瞬时情况下地层损失率之间的关系,并推导出长期情况下各深度处沉降槽宽度系数和最大沉降值的计算式,从而可确定沉降槽的形状。经与现场实测资料和数值模拟结果对比,验证了方法的合理性,可作为实际工程的借鉴。

关 键 词:隧道  地表以下  长期沉降  
收稿时间:2011-01-11

Computation method for long-term surface and subsurface settlements induced by excavation of tunnels in clays
YANG Min,HUANG Ju,SUN Qing,LIU Kan,ZENG Ying-jun. Computation method for long-term surface and subsurface settlements induced by excavation of tunnels in clays[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(2): 217-221
Authors:YANG Min  HUANG Ju  SUN Qing  LIU Kan  ZENG Ying-jun
Affiliation:1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. Technical Center, China Construction Third Engineering Division, Co., Ltd., Wuhan 430070, China; 4. Shanghai No. 2 Municipal Engineering Co., Ltd., Shanghai 200065, China
Abstract:Based on the Mair’s theory of immediate settlement of soil due to tunneling,and the results of finite element simulation,a computation method for the long-term settlement of the soil at surface and subsurface is proposed.Ong’s centrifuge test is simulated first to verify the validity of the finite element model,then a numerical study on the long-term settlement of the soil at different depths is carried out.The relationship between ground losses under immediate and long-term conditions is established.Formulas for width parameter and the maximum settlement of settlement trough at different depths are also given,and the profile of settlement trough can be determined.Compared with the field measurement and numerical simulation,the validity of the proposed method is demonstrated.It can be employed in practical projects.
Keywords:tunnel  subsurface  long-term settlement
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文