首页 | 本学科首页   官方微博 | 高级检索  
     

岸边集装箱起重机机器房与后大梁连接的设计
引用本文:张锋锋.岸边集装箱起重机机器房与后大梁连接的设计[J].起重运输机械,2011(9):20-22.
作者姓名:张锋锋
作者单位:上海振华重工(集团)股份有限公司;
摘    要:针对ZPMC的主产品岸边集装箱起重机,对其机器房与后大梁连接方法进行了详细介绍,指出了其优缺点。实际应用表明,焊接形式Ⅱ具有螺栓连接无可比拟的优越性,能够满足众多用户的要求。

关 键 词:岸边集装箱起重机  机器房  后大梁  连接

Design of connection between machine room and rear-beam of quayside container crane
Zhang Fengfeng.Design of connection between machine room and rear-beam of quayside container crane[J].Hoisting and Conveying Machinery,2011(9):20-22.
Authors:Zhang Fengfeng
Affiliation:Zhang Fengfeng
Abstract:The paper presents the connecting between the machine room and the rear-beam in detail for the ZPMC main product-quayside container crane,and points out the advantages and shortcomings.The practical application indicates that the welding form II has an incomparable superiority that the bolt connection does not have,and can meet the requirements of the majority of users.
Keywords:quayside container crane  machine room  rear-beam  connection  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号