糯扎渡水电站截流施工技术
引用本文:杨兴堂.糯扎渡水电站截流施工技术[J].西北水电,2012(3):43-45.
作者姓名:杨兴堂
作者单位:中国水利水电建设集团咨询西北公司,西安,710065
摘    要:糯扎渡水电站大江截流通过左岸2条导流隧洞泄流,截流流量为2890m3/s,龙口最大流速9.02m/s,合龙时龙口最大水位落差8.71m。在截流戗堤地形、地质条件复杂情况下,成功实现了大流量、大落差、高流速大江截流。

关 键 词:截流  施工技术  糯扎渡水电站  大流量  大落差  高流速

Technology on River-closure Construction of Nuozhadu Hydropower Project
YANG Xing-tang.Technology on River-closure Construction of Nuozhadu Hydropower Project[J].Northwest Water Power,2012(3):43-45.
Authors:YANG Xing-tang
Affiliation:YANG Xing-tang(China Hydro Consulting Engineering Corporation,Northwest Branch,Xi’an 710065,China)
Abstract:Water is discharged from two diversion tunnels in left bank when river is closed for construction of Nuozhadu Hydropower Project.The river-closure discharge is 2 890 m3/s and the maximum flow velocity at the closure gap is 9.02 m/s.The maximum water drop at the closure gap is 8.71 m when the river is closed.In complicated conditions of topography and geology at closure dike,the river with high discharge,great drop and high velocity is successfully closed.
Keywords:River closure  construction technology  Nuozhadu Hydropower Project  high discharge  great drop  high velocity