300 MW机组锅炉MFT后汽机自动快速减负荷的问题探讨
引用本文:陈卫斌,肖大雏.300 MW机组锅炉MFT后汽机自动快速减负荷的问题探讨[J].湖南电力,2003,23(2):1-3.
作者姓名:陈卫斌  肖大雏
作者单位:武汉大学,湖北武汉,430072
摘    要:介绍了在国产引进型300MW火电机组锅炉MFT后汽机快速减负荷的情况和锅炉MFT后不立即跳闸汽轮机可能存在的安全问题,以及对相应的安全措施和利弊进行初探。

关 键 词:锅炉  灭火保护装置  MFT  汽轮机  自动快速减负荷  运行  300MW机组
修稿时间:2003年3月5日

Discussion of Automatic Rapid Load-Sheding of 300MW Unit after Boiler MFT
Chen Weibin,Xiao Dachu.Discussion of Automatic Rapid Load-Sheding of 300MW Unit after Boiler MFT[J].Hunan Electric Power,2003,23(2):1-3.
Authors:Chen Weibin  Xiao Dachu
Abstract:The case of automatic rapid load-sheding of domestic 300MW unit after boiler MFT is introduced in this paper. The probable security problems resulting from not tripping turbine immediately after boiler MFT are proposed along with the relative measures. Also,both advantages and disadvantages of the measures are investigated preliminarily.
Keywords:MW units  trip  MFT  runback/rundown  preventing turbine from water entering