首页 | 本学科首页   官方微博 | 高级检索  
     

高海拔公路隧道施工期粉尘运移特性研究
引用本文:曹正卯,刘晓,牛柏川. 高海拔公路隧道施工期粉尘运移特性研究[J]. 地下空间与工程学报, 2019, 15(3): 927-935
作者姓名:曹正卯  刘晓  牛柏川
作者单位:招商局重庆交通科研设计院有限公司,重庆,400067;西南交通大学希望学院,成都,610400;中国铁路广州铁路局集团有限公司,广州,510699
基金项目:国家重点研发计划(2016YFC0802210);西藏自治区科技计划项目(2016XZ01G31);承德市科学技术局项目(201706A074)
摘    要:为了确定不同海拔高度地区公路隧道施工期粉尘运动规律和粉尘质量浓度分布特性,依托巴朗山高海拔隧道工程展开研究。依据气固两相流理论,利用流体计算软件FLUENT,采用三维k-ε湍流非稳态离散相模型,对公路隧道施工期间粉尘质量浓度在隧道内分布特性及其浓度随海拔高度变化规律进行了三维数值模拟计算分析。研究结果表明:考虑湿度与不考虑湿度对不同海拔地区空气密度计算结果影响误差在0.3 %左右;粉尘在隧道内向洞口运动的动态过程中,最高浓度逐渐降低,在隧道内呈U型形态分布趋势,靠近隧道底部的粉尘浓度高于隧道顶部粉尘浓度;随着海拔高度增加,同一测点粉尘质量浓度随海拔高度以线性形式减小,粉尘浓度海拔高度修正系数可按K=-3×10-5 h+1进行计算。

关 键 词:高海拔  公路隧道  施工通风  粉尘质量浓度  运移特性
收稿时间:2018-11-16

Migration Characteristics of Dust during Construction Stage inHighway Tunnels at High Altitude Areas
Cao Zhengmao,Liu Xiao,Niu Baichuan. Migration Characteristics of Dust during Construction Stage inHighway Tunnels at High Altitude Areas[J]. Chinese Journal of Underground Space and Engineering, 2019, 15(3): 927-935
Authors:Cao Zhengmao  Liu Xiao  Niu Baichuan
Abstract:The movement regularity and mass concentration distribution characteristics of dust during the construction stage of highway tunnels at different altitudes are studied based upon the Balangshan tunnel. The distribution characteristics in highway tunnel and the regularity variation at different altitudes of dust concentration are simulated and analyzed with FLUENT through the three-dimensional k-ε unsteady turbulent DPM model. The measured data agrees well with the numerical simulation results. The results indicate that the influence of air humidity at different altitudes on the deviation of air density calculation results is about 0.3%. The peak concentration of dust decreases gradually in the dynamic processes of movement to the tunnel entrance, which is U-shaped distribution in the tunnel. Dust mass concentration at the bottom of the tunnel is higher than that at the top. For the impact of environmental atmospheric pressure with the altitude increase, the mass concentration of dust decreases linearly at the same measuring point, the correction coefficient can be calculated by K=-3×10-5 h+1.
Keywords:high altitude  highway tunnels  construction ventilation  dust mass concentration  migration characteristics  
本文献已被 万方数据 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号