首页 | 本学科首页   官方微博 | 高级检索  
     

铁路下采煤的技术措施
引用本文:李秋辉. 铁路下采煤的技术措施[J]. 煤炭技术, 2008, 27(6): 84-85
作者姓名:李秋辉
作者单位:七台河矿业精煤集团公司,新建煤矿,黑龙江,七台河,154600
摘    要:地表移动和变形对铁路路基、线路产生严重影响。铁路下采煤应满足一定的采深与采厚比,防止地表突然沉陷或消除和减轻地表变形的叠加影响,应合理布置工作面,留设好铁路煤柱,并采取地面维修措施。

关 键 词:铁路下采煤  地表移动变形  技术措施

Technical Measures of Coal Mining Under Railway
LI Qiu-hui. Technical Measures of Coal Mining Under Railway[J]. Coal Technology, 2008, 27(6): 84-85
Authors:LI Qiu-hui
Abstract:The surface movement and deformation have serious influence on the railway embankment and lines.Mining under railway should meet certain mining depth and mining thickness ratio,in order to prevent a sudden surface subsidence and reduce or eliminate the superposition of surface deformation effects,should rationally arrange faces,retain railway pillars,and take measures of ground maintenance.
Keywords:mining under railway  mobile surface deformation  technical measure  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号