首页 | 本学科首页   官方微博 | 高级检索  
     

百色水利枢纽招标设计升压站方案比较
引用本文:吕涛,胡海泓.百色水利枢纽招标设计升压站方案比较[J].广西水利水电,2000(2):50-52,59.
作者姓名:吕涛  胡海泓
作者单位:广西水利电力勘测设计研究院,广西,南宁,530023
摘    要:百色水利枢纽升压站是电站工程的重要配套工程。招标设计阶段 ,为选择合理的升压站配电设备及布置方案 ,对GIS和主变压器地下洞内布置、GIS和主变压器地面户内布置、常规设备和主变压器户外敞开式布置 3个方案进行技术经济全面比较 ,最后推荐采用GIS和主变压器地下洞内布置方案。

关 键 词:百色水利枢纽  招标设计  升压站  GIS  主变压器  布置

Electric power step-up substation scheme comparison for inviting design of Baise project
LU Tao,HU Hai-hong.Electric power step-up substation scheme comparison for inviting design of Baise project[J].Gx Water Resources & Hydropower Engineering,2000(2):50-52,59.
Authors:LU Tao  HU Hai-hong
Abstract:Electric power step_up substation is the important corollary engineering of Baise hydropower station.In inviting design stage, to select rational equipment and layout scheme,designers made technique and economic comparison to three schemes and commended GIS and main transformer underground hole layout scheme.
Keywords:Baise project  inviting design  electric power step_up substation  GIS  main transformer  layout  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号