长洲水利枢纽工程施工期通航设计
引用本文:刘家虎,冯健.长洲水利枢纽工程施工期通航设计[J].红水河,2007,26(B10):1-4.
作者姓名:刘家虎  冯健
作者单位:广西电力工业勘察设计研究院,南宁530023
摘    要:介绍长洲水利枢纽工程施工导流方案,施工期通航程序及措施,妥善安排西江航运干线施工期通航,对有通航要求的河道上建设水电工程有一定的借鉴价值。

关 键 词:施工导流  施工程序  通航标准  模型试验  施工期通航  长洲水利枢组
文章编号:1001-408X(2007)S0-0001-04
收稿时间:2007-06-18

Navigation Design in Construction Period for Changzhou Multi-purpose Water Project
LIU Jia-hu, FENG Jian.Navigation Design in Construction Period for Changzhou Multi-purpose Water Project[J].Hongshui River,2007,26(B10):1-4.
Authors:LIU Jia-hu  FENG Jian
Affiliation:Guangxi Electric Power Industry Investigation Design and Research Institute, Nanning 530023
Abstract:The construction diversion scheme for Changzhou Multi-purpose Water Project, navigation procedures and measures adopted during construction period are introduced in this paper. With these efforts, the navigation along the trunk line of Xijiang River during construction is well arranged, whose successful experience may be referred to by hydropower projects with navigation requirement to be constructed on river channel.
Keywords:construction diversion  construction procedure  navigation standard  model test  navigation duringconstruction period  Changzhou Multi-purpose Water Project
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号