首页 | 本学科首页   官方微博 | 高级检索  
     

基于双种群CSO算法重构的含DG配网故障恢复
引用本文:罗春辉,瞿纲举,汤涛,刘珺瑶,蒋嘉栋,罗伟原.基于双种群CSO算法重构的含DG配网故障恢复[J].湖南电力,2021,41(1):11-17.
作者姓名:罗春辉  瞿纲举  汤涛  刘珺瑶  蒋嘉栋  罗伟原
作者单位:湖南省送变电工程有限公司,湖南长沙410015;湖南省送变电工程有限公司,湖南长沙410015;智能电网运行与控制湖南省重点实验室,湖南长沙410114;长沙理工大学,湖南长沙410114;湖南省送变电工程有限公司,湖南长沙410015;湖南省送变电工程有限公司,湖南长沙410015;国网湖南省电力有限公司检修公司,湖南长沙410004
基金项目:国家自然科学基金资助项目
摘    要:为兼顾配网故障恢复的快速性和最优性,提出一种基于重构的分级响应故障恢复方法,并应用双种群纵横交叉(crisscross optimization algorithm,CSO)算法寻求重构方案.首先在故障隔离后利用启发式规则进行局部重构,以较少的开关动作次数快速恢复配网连通性.然后在局部重构后有安全指标越限时,利用改进的...

关 键 词:配电网  故障恢复  重构  可行域  纵横交叉算法

Service Restoration of Distribution Network with DG Based on Dual-population CSO Algorithm
LUO Chunhui,QU Gangju,TANG Tao,LIU Junyao,JIANG Jiadong,LUO Weiyuan.Service Restoration of Distribution Network with DG Based on Dual-population CSO Algorithm[J].Hunan Electric Power,2021,41(1):11-17.
Authors:LUO Chunhui  QU Gangju  TANG Tao  LIU Junyao  JIANG Jiadong  LUO Weiyuan
Affiliation:(Hunan Electric Power Transmission and Transformation Engineering Co.,Ltd.,Changsha 410015,China;Hunan Province Key Laboratory of Smart Grids Operation and Control,Changsha 410114,China;Changsha University of Science and Technology,Changsha 410114,China;State Grid Hunan Electric Power Company Limited Maintenance Company,Changsha 410004,China)
Abstract:To guarantee both the speediness and global optimization of service restoration of distribution network simultaneously, a hierarchical response fault recovery method based on reconfiguration is proposed, and the crisscross optimization(CSO) algorithm with dual dual-population is applied to seek the reconstruction scheme. Firstly, partial reconstruction using heuristic rules for non-islanding operation is implemented for fast restoration of distribution network connectivity with fewer switching times. Secondly, the optimal solution is searched in the feasible region by CSO algorithm with dual dual-population for global reconstruction while the safety indicators are over-limit, and if the safety indicators are still over-limit, part of non-critical load is shed in the order of the importance index of the load until the disribution network is back to a new safe operation state. Finally, the feasibility and effectiveness of the proposed method are verified by simulation results of improved PG&E distribution system.
Keywords:distribution network  service restoration  reconfiguration  feasible region  crisscross optimization algorithm
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号