首页 | 本学科首页   官方微博 | 高级检索  
     


Semantics for linking data from 4D BIM to digital collaborative support
Authors:Calin BOJE  Veronika BOLSHAKOVA  Annie GUERRIERO  Sylvain KUBICKI  Gilles HALIN
Abstract:Synchronous collaboration sessions within the context of 4D BIM position construction professionals into a complex socio–technical system. This system includes hardware, software, people, and broader community aspects. This article strictly focuses on the ontology representation of synchronous collaboration sessions with collocated collective decision-making. The model is designed by considering various 4D BIM model uses while a digital multiuser touch table facilitates the collaboration between actors. The outlined ontological model aims to improve interoperability and to move toward a knowledge-driven, smart-built environment paradigm. A knowledge engineering methodology is outlined, by virtue of which the semantics of the presented model are defined and discussed. Concepts from nearby knowledge fields, especially from the Industry Foundation Classes, are reused. Several examples on querying the knowledge base according to the project meeting requirements are outlined to demonstrate the benefits of using the model. Although 4D BIM model data can be imported by using standard formats, capturing data about the social context remains a challenge in the future. This is expected to change the ontology model structure by considering user ergonomics, data modeling requirements, as well as technical implementation constraints.
Keywords:4D BIM  ontology  IFC  decision-making  linked data  collaboration  planning  
点击此处可从《工程管理前沿(英文版)》浏览原始摘要信息
点击此处可从《工程管理前沿(英文版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号