西龙池抽水蓄能电站输水系统大坡度超长斜井开挖施工中的难点及对策
引用本文:姬脉兴. 西龙池抽水蓄能电站输水系统大坡度超长斜井开挖施工中的难点及对策[J]. 电网与水力发电进展, 2005, 21(3): 57-60
作者姓名:姬脉兴
作者单位:中国水利水电第三工程局 陕西西安710016
摘    要:本文针对西龙池抽水蓄能电站输水系统大坡度超长斜井开挖的施工难点进行了研讨,提出了解决的措施及对策,保证了工程的顺利进行。

关 键 词:西龙池电站  输水系统  大坡度超长斜井  措施  对策
文章编号:1671-4768(2005)03-0057-04
修稿时间:2005-06-26

The Conundrum and Countermeasures in Construction of Excavating Over Length Inclined Shaft With High-gradient Conduit System in Xilongchi Pumped-storage Power Station
JI Mai-xing. The Conundrum and Countermeasures in Construction of Excavating Over Length Inclined Shaft With High-gradient Conduit System in Xilongchi Pumped-storage Power Station[J]. Advance of Power System & Hydroelectric Engineering, 2005, 21(3): 57-60
Authors:JI Mai-xing
Abstract:In accordance with the conundrum in construction of excavating over length inclined shaft with high-gradient conduit system in Xilongchi Pumped-storage Power Station,a discussion has been made and some efficiency countermeasures have been presented,so that ensured the construction smooth advance.
Keywords:Xilongchi Pumped-storage Power Station  conduit system  over length inclined shaft with high gradient  measure  countermeasure