1080m^3高炉基础大体积混凝土施工
引用本文:曹利军,胡孝平,李少华.1080m^3高炉基础大体积混凝土施工[J].山西建筑,2007,33(30):162-163.
作者姓名:曹利军  胡孝平  李少华
作者单位:中冶天工渤海分公司,天津,300301
摘    要:以某钢厂1080m^3高炉基础为例,详细地介绍了高炉基础大体积混凝土的施工,重点探讨了混凝土施工中温度的计算、双掺技术、保温、保湿及补偿措施等,以有效地控制混凝土裂缝,可供高炉基础施工工程借鉴。

关 键 词:大体积混凝土  施工  高炉  基础
文章编号:1009-6825(2007)30-0162-02
修稿时间:2007-05-14

Mass concrete construction of base of 1 080 m^3 blast furnace
CAO Li-jun,HU Xiao-ping,LI Shao-hua.Mass concrete construction of base of 1 080 m^3 blast furnace[J].Shanxi Architecture,2007,33(30):162-163.
Authors:CAO Li-jun  HU Xiao-ping  LI Shao-hua
Abstract:Taking base work of 1 080 m^3 blast furnace in one steel plant the construction of mass concrete is introduced in detail. The calculation of temperature, dual permeable technique, insulation, compensation measures and other effective measures for cracks control are mainly discussed in order to provide references for similar works.
Keywords:mass concrete  construction  blast furnace  base