摘    要:从基层墙面清理、粘结层厚度、网格布铺贴、抗裂层厚度、外装涂饰层等方面对粘贴式外墙外保温的施工过程控制进行了详细阐述,以确保外墙外保温工程的施工质量。

关 键 词:外墙外保温  基层墙面  粘结层  抗裂层
文章编号:1009-6825(2007)35-0266-02
修稿时间:2007-08-22

Process control of plastering-type external wall exterior heat-insulation construction
JIA Hong-wen. Process control of plastering-type external wall exterior heat-insulation construction[J]. Shanxi Architecture, 2007, 33(35): 266-267
Authors:JIA Hong-wen
Affiliation:JIA Hong-wen
Abstract:This paper illustrates the process control of plastering-type external wall exterior heat-insulation construction from wall cleaning in base course,thickness of tack coat,paving of grid cloth,thickness of crack resistant layer and external decorative costing,in order to ensure the construction quality of external wall exterior heat-insulation project.
Keywords:external wall exterior heat-insulation  base course wall  tack coat  crack resistant layer