三峡左岸电站厂房施工设计概述
引用本文:姚勇强,王永玲. 三峡左岸电站厂房施工设计概述[J]. 中国三峡建设, 2002, 9(12): 6-7
作者姓名:姚勇强  王永玲
作者单位:长江水利委员会设计院,长江水利委员会设计院 湖北武汉 430010,湖北武汉 430010
摘    要:三峡左岸电站厂房属坝后引水式厂房。机组为立轴混流式,单机容量700MW,总装机容量9800MW。电站厂房共设14台机组、3个安装场,总长643.7m,底宽68m,最大高度93.8m,机组中心距38.3m,主厂房上下游平台高程82m;上游副厂房宽17m,高40m,总长619.8m;尾水平台宽19.5m,尾水渠宽580-310m,渠底高程29.9-50m。高程67m以下为大体积结构,高程67m以上为钢筋混凝土薄壁结构。三峡左岸电站厂房规模宏大,施工工序繁杂,要求的施工工期紧张,切实做好施工设计,是保障其有序施工和按期投产的先决条件。

关 键 词:三峡左岸电站 厂房 设计 概述 施工进度 机组 引水式厂房 薄壁结构
文章编号:1006-6349(2002)12-0006-02
修稿时间:2001-11-06

Construction Design of Three Gorges Left Powerhouse
YAO Yong-qiang , WANG Yong-ling. Construction Design of Three Gorges Left Powerhouse[J]. China Three Gorges Construction, 2002, 9(12): 6-7
Authors:YAO Yong-qiang & WANG Yong-ling
Abstract:The Three Gorges left powerhouse located at the left dam toe is of a diversion type, has a total installed capacity of 9 800 MW and 14 vertical shaft turbines of 700 MW each. The powerhouse has a total length of 643. 7 m, a bottom width of 68 m and a maximum height of 93. 8 m, with 3 erection bays. The central space is 38. 3 m between turbines, and the elevation of the up-and downstream platforms for the main powerhouse is 82 m; the upstream auxiliary powerhouse has a width of 17 m and height of 40 m, with a total length of 619. 8 m; the tailwater platform has a width of 19. 5 m, and the tailrace canal has a width of 580-310 m and bottom elevation of 29. 9-50 m. The powerhouse is composed of massive structures below elevation 67 m and thin reinforced concrete structures above elevation 67 m. The construction sequences for the powerhouse are very complicated as a result of its huge size and tight time requirements. A good construction design, therefore, could be the prerequisite to ensure an orderly construction and operation on schedule.
Keywords:Three Gorges project  powerhouse  construction progress  civil wprks  unit.