摘    要:高岭头水电站大坝是我省较早采用砼拱坝的中型水利工程之一,1998年发现渗漏,渗漏量在温度下降时,特别是零度左右时,大坝渗漏量增加,在2000年3月,渗漏量达到400m^3/d,严重影响到大坝的安全运行,查明渗漏原因是当务之急。

关 键 词:拱坝  渗漏  安全运行  高岭头水电站
文章编号:1008-536(2002)01-0015-02

Analyzing and Evaluating of Seepage of Arch Dam Embankment of Gaolingtou
WENG Xin,hai.Analyzing and Evaluating of Seepage of Arch Dam Embankment of Gaolingtou[J].Journal of Zhejiang Water Conservancy and Hydropower College,2002,14(1):15-16.
Authors:WENG Xin  hai
Abstract:The dam is one of the earlier concrete arch dams,seepage was found in 1998.When the temperature fell down,the seepage increased.Especially,in March,2000,seepage reached 400m 3/d,safety running is severely affected.Therefore,it is urgent to find the cause of seepage.