摘    要:南山一级水电站工程地处广西南山深处,地形复杂、植物茂密。水电站明敷设高水头压力钢管采用壁厚58mm的Q390C低合金钢在中国尚属首次。为了确保安装质量,在压力钢管安装前对钢管母材Q390C低合金钢进行了详细的焊接工艺评定,在安装过程中不断优化改进安装、焊接、水压试验技术方案,保证了压力钢管安装顺利进行。

关 键 词:南山一级水电站  压力钢管  安装技术  高水头

Installation technology of high head and thick-wall penstock for Nanshan I hydropower project
HU Bao-yu. Installation technology of high head and thick-wall penstock for Nanshan I hydropower project[J]. Northwest Water Power, 2010, 0(1): 42-45
Authors:HU Bao-yu
Affiliation:HU Bao-yu(Sinohydro Engineering Bureau 15,Xi'an 710065,China)
Abstract:Nanshan hydropower project is located in the remote Nanshan mountains in Guanxi province,with complicated topography and thick plants.It is the first time in China that open-laid high head penstock is of Q390C low-alloy steel with 58mm thick wall.To ensure the installation quality,careful assessment was made on welding technology of Q390C low-alloy steel as the base metal of penstock before installation.The technical option on installation,welding and water pressure tests is continuously optimized and impro...