首页 | 本学科首页   官方微博 | 高级检索  
     


Finite capacity scheduling systems: Performance issues and comparisons
Authors:ST  Enns
Affiliation:

Faculty of Management, University of Calgary, 2500 University Drive NW, Calgary, Alberta, T2N 1N4, Canada

Abstract:This study examines the flowtime, schedule stability and delivery performance results for finite capacity scheduling (FCS) systems. Two common schedule construction approaches, blocked-time and event-driven, are compared. A production shop simulation model facilitates the testing of these two approaches using either internally or externally specified due dates. Also, various due-date dependent loading rules are used in schedule construction. The results show that using the event-driven schedule construction approach along with internally specified due dates works best. Flowtime, flowtime variability and mean tardiness are lower when comparing the event-driven approach to the blocked-time approach as well as when comparing internally to externally set due dates. Schedule stability results are less consistent, with performance being largely a function of the loading rule when the blocked-time approach is used.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号