做好公伯峡水电站施工期环境保护工作
引用本文:王思德. 做好公伯峡水电站施工期环境保护工作[J]. 水力发电, 2004, 30(8): 16-18
作者姓名:王思德
作者单位:黄河上游水电开发有限责任公司建设分公司,青海,化隆,810902
摘    要:公伯峡水电站工程在施工期建立了健全的环境保护管理体系,试行了环境监理制,各项环境保护措施得到了及时落实.施工期的环境污染和生态破坏得到了有效控制,使项目区环境状况得到了较大的改善。

关 键 词:环境保护 污染防治 施工期 公伯峡水电站
文章编号:0559-9342(2004)08-0016-03

Doing environment protection well during the construction period of Gongboxia Hydropower Station
Wang Si de. Doing environment protection well during the construction period of Gongboxia Hydropower Station[J]. Water Power, 2004, 30(8): 16-18
Authors:Wang Si de
Abstract:The Gongboxia hydropower station set up a perfect management system of environmental protection during its construction period. And the environment supervision system has been tried out in order to implement timely the various environmental protection measures so that the environmental pollution and ecological disruption have been effectively controlled during its construction period and the environmental conditions have been greatly improved in the project area.ilar hydro
Keywords:environmental protection  pollution prevention  construction period  Gongboxia Hydropower Station