大跨独塔公轨两用混合梁斜拉桥实用调索方法
引用本文:全伟,温欣,王东升. 大跨独塔公轨两用混合梁斜拉桥实用调索方法[J]. 沈阳工业大学学报, 2021, 43(1): 91-97. DOI: 10.7688/j.issn.1000-1646.2021.01.16
作者姓名:全伟  温欣  王东升
作者单位:1.沈阳建筑大学 交通工程学院, 沈阳 110168; 2. 黄山学院 建筑工程学院, 安徽 黄山 245041; 3. 河北工业大学 土木与交通学院, 天津 300401
基金项目:国家自然科学基金项目(51478074);辽宁省自然科学基金计划重点项目(20170540762);沈阳建筑大学科学研究项目(2017040);黄山学院2019年度校级人才启动项目(2019xkjq009)
摘    要:针对目前斜拉桥调索计算较难掌握的问题,提出了一种混合梁斜拉桥实用调索方法.以国内最宽的公轨两用混合梁斜拉桥佛山南海东平水道大桥为例,理想成桥状态索力采用经验试算法,施工阶段索力采用两阶段调索方法,悬臂拼装阶段索力满足梁重和施工荷载等要求,合龙后索力采用基于MATLAB语言编制的影响矩阵法调索程序进行调索.结果表明,最终...

关 键 词:独塔  公轨两用  混合梁斜拉桥  理想成桥  施工阶段  实用调索方法  MATLAB语言  影响矩阵

Practical cable adjustment method for cable-stayed bridge with single pylon and large-span road-cum-railway hybrid girder
QUAN Wei,WEN Xin,WANG Dong-sheng. Practical cable adjustment method for cable-stayed bridge with single pylon and large-span road-cum-railway hybrid girder[J]. Journal of Shenyang University of Technology, 2021, 43(1): 91-97. DOI: 10.7688/j.issn.1000-1646.2021.01.16
Authors:QUAN Wei  WEN Xin  WANG Dong-sheng
Affiliation:1. School of Transportation Engineering, Shenyang Jianzhu University, Shenyang 110168, China; 2. School of Architecture and Civil Engineering, Huangshan University, Huangshan 245041, China; 3. School of Civil and Transportation Engineering, Hebei University of Technology, Tianjin 300401, China
Abstract:In order to solve the difficult problem of mastering the calculation for cable adjustment of cable-stayed bridge, a practical cable adjustment method for hybrid girder cable-stayed bridge was proposed. Through taking the Foshan Nanhai Dongping River Bridge, which is a road-cum-railway hybrid girder cable-stayed bridge with the largest width in China, as an example, the cable force at the ideally completed bridge state was calculated with an empirical trial method, and the cable force at the construction stage was calculated with the a two-stage method. At the cantilever assembling stage, the cable force met the requirements of girder gravity and construction loads. When the girder was closed, the adjustment of cable force was performed with the program based on the influential matrix method compiled with the MATLAB language. The results show that the errors between the final and ideal cable force of the completed bridge are within 1.9%. The as-proposed practical cable adjustment method has simple calculation principle, fast cable adjustment speed and high cable adjustment accuracy, and is easy to master.
Keywords:single pylon  road-cum-railway  hybrid girder cable-stayed bridge  ideally completed bridge  construction stage  practical cable adjustment method  MATLAB language  influential matrix  