首页 | 本学科首页   官方微博 | 高级检索  
     

变电站接地网上两点间电位差的特性
引用本文:王永红,焦重庆,肖冰,郭安琪,邱桂中,秘立鹏,徐克强.变电站接地网上两点间电位差的特性[J].中国电力,2021,54(1):150-158.
作者姓名:王永红  焦重庆  肖冰  郭安琪  邱桂中  秘立鹏  徐克强
作者单位:1. 国网内蒙古东部电力有限公司电力科学研究院,内蒙古 呼和浩特 010020;2. 华北电力大学 新能源电力系统国家重点实验室,北京 102206;3. 南京恒经通电子科技有限公司,江苏 南京 210000
基金项目:国家自然科学基金资助项目(51307055)。
摘    要:随着变电站的智能化发展,大量二次设备分布式布置于高压一次设备附近.这些二次设备的外壳就地与接地网连接.当故障电流注入接地网导致地电位升时,在接地网上两点之间存在电位差.对于2个由二次电缆连接的二次设备,该电位差可以在二次电缆端口感应共模和差模骚扰电压,严重时影响到二次系统的正常稳定运行.针对某220kV变电站接地网,计...

关 键 词:CDEGS  变电站  接地网  地电位差  过电压保护与接地
收稿时间:2019-07-05
修稿时间:2019-08-22

The Potential Difference Characteristics between Two Points on Grounding Grid of Substation
WANG Yonghong,JIAO Chongqing,XIAO Bing,GUO Anqi,QIU Guizhong,BI Lipeng,XU Keqiang.The Potential Difference Characteristics between Two Points on Grounding Grid of Substation[J].Electric Power,2021,54(1):150-158.
Authors:WANG Yonghong  JIAO Chongqing  XIAO Bing  GUO Anqi  QIU Guizhong  BI Lipeng  XU Keqiang
Affiliation:1. State Grid Inner Mongolia East Electric Power Co., Ltd. Power Science Research Institute, Hohhot 010020, China;2. State Key Laboratory of Alternate Electric Power System with Renewable Energy Sources, North China Electric Power University, Beijing 102206, China;3. Hengjingtong Electronic Technology Co., Ltd., Nanjing 210000, China
Abstract:With the intelligentization upgrade of power substations, a large number of secondary equipment are deployed dispersedly nearby the high-voltage primary equipment. The enclosures of these secondary devices are electrically connected to the grounding grid underground. When a fault current injection causes the potential rise in the grounding grid, there is a potential difference between any two points on the grounding grid conductors. For two secondary equipment located at different positions and connected by secondary cable, the potential difference can induce common-mode and differential-mode disturbance voltages at the ports of the secondary cable, which may interfere the normal operation of secondary system. In this paper, the grounding grid of a 220 kV substation is modelled and the corresponding potential difference is calculated by using the CDEGS software. Also, the effects of the grid density and size, soil resistivity, the positions of current injection and potential observation on the potential difference are investigated. The results are helpful for guiding grounding grid design and evaluating the influence of ground potential difference on secondary equipment.
Keywords:CDEGS  power substation  grounding grid  ground potential difference  overvoltage protection and grounding  
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号