平班水电站接入系统方案研究
引用本文:颜永红. 平班水电站接入系统方案研究[J]. 红水河, 2006, 25(1): 70-72
作者姓名:颜永红
作者单位:广西电力工业勘察设计研究院,广西,南宁,530023
摘    要:主要根据平班水电站的特点及电站近区广西电网的具体情况,提出电站接入系统方案并进行潮流、短路电流等计算,经技术经济比较择优推荐电站接入系统方案。并对有关电气设备的选择提出了意见。

关 键 词:接入系统  方案研究  平班水电站
文章编号:1001-408X(2006)01-0070-03
收稿时间:2005-12-25
修稿时间:2005-12-25

Study on Access System Scheme of Pingban Hydropower Station
YAN Yong-hong. Study on Access System Scheme of Pingban Hydropower Station[J]. Hongshui River, 2006, 25(1): 70-72
Authors:YAN Yong-hong
Affiliation:Guangxi Electric Power Industry Investigation Design and Research Indtitute, Nanning 530023, China
Abstract:Based on the features of Pingban Hydropower Station and the practical conditions of Guangxi power grid near the station, the paper presents the access system scheme of the hydropower station and calculates the power flow, short circuit current etc. The optimum scheme for the access system is recommended on the basis of the comparation from the aspects of technique and economy. Besides, the opinions on electric equipment selection are given.
Keywords:access system   scheme study   Pingban hydropower station