小樊一级站水泵出水量减少原因及改进方案分析
引用本文:杨勇. 小樊一级站水泵出水量减少原因及改进方案分析[J]. 电网与水力发电进展, 2006, 22(5): 92-94
作者姓名:杨勇
作者单位:山西水利职业技术学院 山西运城044004
摘    要:本文通过分析和计算得出,(1)水泵出水量减小的主原因是水泵随机资料有误;(2)提高泵站前池水位,增设32SA-19C型水泵是解决供水矛盾的有效措施;(3)加大24SA-18型水泵叶轮,可提高泵站运行的适应性与灵活性。

关 键 词:小樊一级站  水泵  叶轮切削  出水量
文章编号:1671-4768(2006)05-0092-03
修稿时间:2006-10-15

Causation of Outflow Decrease from No.1 Pumping Station of Xiaoman Project and the Improvement Scheme
YANG Yong. Causation of Outflow Decrease from No.1 Pumping Station of Xiaoman Project and the Improvement Scheme[J]. Advance of Power System & Hydroelectric Engineering, 2006, 22(5): 92-94
Authors:YANG Yong
Abstract:According to theoretical analysis and calculation,it was point out that the causation of outflow decrease was due to the incorrect data used for design the pump and resulted in pump blade cutting irrational.The countermeasures were to increase the water level in forebay and to augment a 32SA-19C type pump.Augmentation the blade of 24SA-18 pump can improve the performance and made it run with much adaptive and flexible.
Keywords:No.1 pumping station of Xiaoman Project  Pump  blade cutting  outflow  