首页 | 本学科首页   官方微博 | 高级检索  
     

乌石北江大桥主塔施工技术
引用本文:鄢生全. 乌石北江大桥主塔施工技术[J]. 山西建筑, 2014, 0(14): 208-209
作者姓名:鄢生全
作者单位:广东长大公路工程有限公司第一分公司,广东广州511431
摘    要:阐述了乌石北江大桥主塔施工的方案,对劲性骨架施工、索导管安装及调整、塔柱爬模系统及预应力施工等关键技术的施工要点进行了详细介绍,以确保工程的质量,实现主塔的成功封顶。

关 键 词:主塔施工  劲性骨架  索导管  爬模

Construction techniques for bridge tower of Wnshi Beijiang
YAN Sheng-quan. Construction techniques for bridge tower of Wnshi Beijiang[J]. Shanxi Architecture, 2014, 0(14): 208-209
Authors:YAN Sheng-quan
Affiliation:YAN Sheng-quan ( First Branch Company, Guangdong Provincial Changda Highway Engineering Co. , Ltd, Guangzhou 511431, China)
Abstract:This paper elaborated the main tower construction scheme of Wushi Beijiang Bridge, introduced in detail the construction key points of stiff skeleton construction, cable duct installation and adjustment, tower climbing formwork system and pre-stressed construction and other aspects, in order to ensure the engineering quality, realized the successful caps.
Keywords:main tower construction   stiff skeleton   cable duct   climbing formwork
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号