论建设工程结算的风险控制
引用本文:郭生明.论建设工程结算的风险控制[J].山西建筑,2014(16):276-277.
作者姓名:郭生明
作者单位:山西六建集团有限公司,山西太原030024
摘    要:探究了建设工程结算风险发生的原因,分析了有效避免建设工程结算风险出现的手段,包括明确合同内容、规避结算审计风险、做好签证工作等内容,以期采用科学的方法对工程结算加以控制,能够有效地规避工程结算风险。

关 键 词:建设工程  结算  风险

On risk control of construction engineering settlement
GUO Sheng-ming.On risk control of construction engineering settlement[J].Shanxi Architecture,2014(16):276-277.
Authors:GUO Sheng-ming
Affiliation:GUO Sheng-ming ( Shanxi Sixth Construction Group Co. , Ltd, Taiyuan 030024, China)
Abstract:The paper explores the reasons for the settlement risks of the construction projects, analyzes the measures to avoid these risks effectively in the projects, including the identification of the contract contents, avoidance of the settlement audit risks, and the certification, so as to adopt the scientific method to control the engineering settlement and avoid the engineering settlement risks.
Keywords:construction project  settlement  risk