首页 | 本学科首页   官方微博 | 高级检索  
     

田陈煤矿新风井凿井施工方案探索
引用本文:孙启栋,陈殿芬.田陈煤矿新风井凿井施工方案探索[J].煤炭技术,2014(5):116-117.
作者姓名:孙启栋  陈殿芬
作者单位:枣庄矿业集团中兴建安工程有限公司
摘    要:田陈煤矿新风井采用ⅢG型凿井井架,立井机械化配套设施、稳车集中控制、一模两用、一管两用等一系列合理措施,优化布置设计,取得了较好的效果。

关 键 词:凿井设施  优化布置  探索

Exploration of Tianchen Coal Mine New Ventilation Shaft Sinking Construction Scheme
SUN Qi-dong;CHEN Dian-fen.Exploration of Tianchen Coal Mine New Ventilation Shaft Sinking Construction Scheme[J].Coal Technology,2014(5):116-117.
Authors:SUN Qi-dong;CHEN Dian-fen
Affiliation:SUN Qi-dong;CHEN Dian-fen;Zhongxing Construction and Installation the Project Limited Company,Zaozhuang Mining Group Comp.;
Abstract:Tianchen coal mine new ventilation shaft using ⅢGderrick, vertical shaft mechanical facilities,centralized of control vehicle stability, a set of templates two usage, a tube two usage and a series of reasonable measures, optimize the layout design, and achieved good results.
Keywords:sinking facilities  layout optimization  exploration
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号