脱硫工程后评估的必要性及对后评估工作的建议
引用本文:舒惠芬.脱硫工程后评估的必要性及对后评估工作的建议[J].中国电力,2005,38(11):66-68.
作者姓名:舒惠芬
作者单位:国家电网公司,北京,100055
摘    要:根据国家发展和改革委员会《关于加快火电厂烟气脱硫产业的发展的若干意见》,就“开展火电厂烟气脱硫设施后评估”提出评估的一些认识和具体建议,包括确定评估的阶段划分、细化每个阶段的目的要求和对现状作出客观判断等。

关 键 词:烟气脱硫  后评估  国产化
文章编号:1004-9649(2005)11-0066-03
收稿时间:2005-06-20
修稿时间:2005年6月20日

Necessity of post-FGD engineering evaluation and suggestions for evaluating measures
SHU Hui-fen.Necessity of post-FGD engineering evaluation and suggestions for evaluating measures[J].Electric Power,2005,38(11):66-68.
Authors:SHU Hui-fen
Affiliation:State Grid Corporation of China, Beijing 100055, China
Abstract:In accordance with the Advice on How to Promote the Development of FGD Industrialization issued by the National Development and Reform Commission, the recognition and specific suggestions were proposed in the field of post-evaluation for the FGD facilities in thermal power plants. Typically, the suggestion covers the determination of individual phases, detailed purpose and requirement for each and objective assessment of the situation.
Keywords:FGD  post-evaluation  localization