首页 | 本学科首页   官方微博 | 高级检索  
     


ARIES-AT maintenance system definition and analysis
Authors:Lester M. Waganer  The ARIES Team
Affiliation:

The Boeing Company, Mail Code S270-3760, PO Box 516, St. Louis, MO 63166, USA

Abstract:A fusion power plant must have a high availability to be competitive in the electrical generation market. Attaining high plant availability is difficult because the fusion power core has a limited service lifetime. Moreover, the core components are radioactive and very large. To assess these issues, the maintainability of the ARIES fusion power core is analyzed and integrated into the early power core design process, which results in a maintainability approach capable of attaining a relatively short refurbishment time. The developed timelines are presented for the scheduled maintenance of the power core. The short core refurbishment time coupled, with evolutionary improvements in the maintainability of the reactor plant equipment and the balance-of-plant equipment, infer an attractive plant availability in the range of 90%.
Keywords:ARIES   Fusion   Tokamak   Maintenance   Availability   Power core   Vacuum vessel
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号