首页 | 本学科首页   官方微博 | 高级检索  
     

磨刀门特大桥50 m预应力混凝土T梁架设工艺
引用本文:刘宏昌,苏年就. 磨刀门特大桥50 m预应力混凝土T梁架设工艺[J]. 山西建筑, 2007, 33(2): 339-340
作者姓名:刘宏昌  苏年就
作者单位:广东省长大公路工程有限公司第二分公司,广东,广州,511430
摘    要:介绍了SDLB-50双导梁型架桥机的特点及其架设施工工艺,对机过孔法的步骤进行了阐述,并对机械及电气设备日常安全检查方面进行了总结论述,供今后类似桥梁施工参考借鉴。

关 键 词:预应力混凝土梁  架桥机  后支架
文章编号:1009-6825(2007)02-0339-02
修稿时间:2006-07-10

Erection technique of 50 m T-shaped and prestressed concrete beam in the extra large bridge in Modaomen
LIU Hong-chang,SU Nian-jiu. Erection technique of 50 m T-shaped and prestressed concrete beam in the extra large bridge in Modaomen[J]. Shanxi Architecture, 2007, 33(2): 339-340
Authors:LIU Hong-chang  SU Nian-jiu
Affiliation:LIU Hong-chang SU Nian-jiu
Abstract:It introduces JSDLB-50 twin-conductor beam deep bridge-laying machine and the erection construction technique,represents the process of punching,and generalizes and discusses the aspect of running safety check to mechanical and electrical equipment,which will supply reference to the similar bridge construction.
Keywords:prestressed concrete beam  bridge-laying machine  rear support bracket
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号