首页 | 本学科首页   官方微博 | 高级检索  
     

苏丹SHELUNGO—1井钻井设计与施工
引用本文:邱传俊. 苏丹SHELUNGO—1井钻井设计与施工[J]. 石油钻探技术, 2001, 29(4): 31-33
作者姓名:邱传俊
作者单位:中原石油勘探局钻井集团公司技术部,
摘    要:对苏丹SHELUNGO-1井钻井、完井技术等有关问题进行了探讨,并提出了若干建议,这将对今后我国参与国际钻井市场竞争产生积极的影响,同时对于我国钻井技术的发展及思维模式的转变也有一定的借鉴作用。

关 键 词:石油钻井 井身结构 钻具组合 钻井参数 钻井液 固井 SHELUNGO-1井 苏丹
文章编号:1001-0890(2001)04-0031-03
修稿时间:2001-02-16

Drilling Design and Operation of SHELUNGO-1 Well in Sudan
Qiu Chuan jun. Drilling Design and Operation of SHELUNGO-1 Well in Sudan[J]. Petroleum Drilling Techniques, 2001, 29(4): 31-33
Authors:Qiu Chuan jun
Abstract:Some drilling and completion technical problems in SHELUNGO 1 Well in Sudan are studied and some suggestions are put forward in this paper. It has positive effect on our nation's competition in the international drilling market. It also has referencing meanings to the development of our drilling techniques and transforming of our style of thought.
Keywords:engineering design  casing program  bottom hole assembly  drilling parameter  drilling fluid  well cementing  SHELUNGO 1 Well  Sudan
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号