催化装置再生器烟囱更换吊装施工
引用本文:汤胜宁,徐至钧.催化装置再生器烟囱更换吊装施工[J].石油工程建设,2004,30(4):43-44.
作者姓名:汤胜宁  徐至钧
作者单位:深圳市粤地建设工程有限公司,广东,深圳,518026
摘    要:某厂检修期间需将催化装置再生器上的旧烟囱拆除,安装新烟囱,场地狭小,吊装难度较大,通过制定合理的吊装方案,安全快捷地完成了任务。该吊装方案是:在再生器顶部标高40m的平台上设置一组长24m的A型推扒杆及相应的滑车组,利用卷扬机提升。文章介绍了吊装机具的设置以及旧烟囱拆除、新烟囱安装的方法和步骤。

关 键 词:催化装置  再生器  烟囱  吊装
文章编号:1001-2206(2004)04-0043-02
修稿时间:2004年3月30日

Replacement and Hoisting Construction of Regenerator Chimney of Catalytic Equipment
TANG Sheng-ning.Replacement and Hoisting Construction of Regenerator Chimney of Catalytic Equipment[J].Petroleum Engineering Construction,2004,30(4):43-44.
Authors:TANG Sheng-ning
Abstract:The old chimney located at regenerator of catalytic equipment was needed to remove and a new one was needed to install during a factory's overhaul.But hoisting operation faced certain diffi-culty because of small work site.Through making suitable hoisting plan,the task was fulfilled safely and successfully.The hoisting plan was to set up an A shaped mast of24m long and a pulley block on the platform at the altitude of40m located on regenerator top;a cable hoister was applied to lifting.This paper introduces the setting up of hoisting device,the method and procedure of old chimney removal and new chimney installation.
Keywords:catalytic equipment  regenerator  chimney  hoisting