首页 | 本学科首页   官方微博 | 高级检索  
     

基于突变级数法的新城金矿顶底柱回采方法优选
引用本文:王青元,朱万成,刘凯,侯晨.基于突变级数法的新城金矿顶底柱回采方法优选[J].金属矿山,2015,44(12):24-28.
作者姓名:王青元  朱万成  刘凯  侯晨
作者单位:深部金属矿山安全开采教育部重点实验室,辽宁 沈阳 110819
基金项目:* 国家自然科学基金项目(编号:51304037,51222401,51374049),教育部科学技术研究重点项目(编号:113019A),中央高校基本科研业务费项目(编号:N120101001,N120301002),中国-南非联合研究计划项目(编号:2012DFG71060/CS06-L01),教育部博士点基金课题项目(编号:20110042110035)。
摘    要:新城金矿Ⅴ#矿体-580 m中段顶柱矿石品位高,但地质条件复杂,回采存在安全隐患。为了确定适合新城金矿顶底柱回采的最优采矿方法,引入突变理论对采矿方法的选择问题进行研究,利用突变数学和模糊数学结合引出的突变级数法建立采矿方法综合优越度评判模型。基于突变级数法的边坡稳定性评判法综合考虑了采矿方法选择的不同影响因素(安全、生产能力、经济技术),根据归一公式作量化递归运算,得到3种采矿方法的突变级数分别为0.972、0.969、0.956,从而确定了方法I最优。井下工业性试验结果显示,该采矿方法是合理的,表明将突变级数法应用到采矿方法的优选当中是可行的。

关 键 词:突变级数法  顶柱回采  采矿方法优选  地压监测  

Mining Method Optimization for Recovering Crown Pillar in Xincheng Gold Mine Based on Catastrophe Progression Method
Wang Qingyuan,Zhu Wancheng,Liu Kai,Hou Chen.Mining Method Optimization for Recovering Crown Pillar in Xincheng Gold Mine Based on Catastrophe Progression Method[J].Metal Mine,2015,44(12):24-28.
Authors:Wang Qingyuan  Zhu Wancheng  Liu Kai  Hou Chen
Affiliation:Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines,Shenyang 110819,China
Abstract:The ore grade of crown pillar at -580 m level of Ⅴ# ore body in Xincheng gold mine is high.But there exists hidden danger to recover it due to the complex geological conditions.In order to determine the optimal mining method for crown pillars,a catastrophe theory is adopted to optimize the mining method.The catastrophe progression method with the catastrophe mathematics and fuzzy mathematics is used to establish an integrated superiority evaluation model of mining method.Based on slope stability evaluation method of catastrophe progression,different factors (safety,capacity,economic and technical index) for mining method selection are comprehensively considered.According to the normalized quantitative recursive formula for computing,the mutation progression of three mining schemes is determined to be 0.972,0.969,0.956 respectively,so scheme I is optimal.The underground industrial test showed that scheme I is reasonable.It is feasible to apply the mutation progression method into the optimization of mining method.
Keywords:Catastrophe progression method  Crown pillar recovery  Mining optimization  Ground pressure monitoring
本文献已被 CNKI 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号