首页 | 本学科首页   官方微博 | 高级检索  
     

间接预测法在母线负荷预测中的应用
引用本文:杨理才,张文磊,周勇,廖峰,许成卓,程义明,姚建刚.间接预测法在母线负荷预测中的应用[J].电网技术,2011,35(12):177-182.
作者姓名:杨理才  张文磊  周勇  廖峰  许成卓  程义明  姚建刚
作者单位:1. 湖南大学电气与信息工程学院,湖南省长沙市,410082
2. 湖南省电力调度通信局,湖南省长沙市,410007
3. 湖南湖大华龙电气与信息技术有限公司,湖南省长沙市,410082
摘    要:为避免220kV母线供电区域内负荷转供、停电以及小电源等因素对母线负荷预测的不利影响,提出了一种间接预测母线负荷的方法。首先把母线下网负荷转换成该母线供电区域内的理想用电负荷,再将该理想用电负荷作为历史负荷数据采用系统负荷预测的算法进行预测得到初步预测结果,同时获取待预测日各种影响因素的值,初步预测结果剔除各种影响因素...

关 键 词:母线负荷预测  小电源  负荷转供  下网负荷  间接预测

Application of Indirect Forecasting Method in Bus Load Forecasting
YANG Licai,ZHANG Wenlei,ZHOU Yong,LIAO Feng,XU Chengzhuo,CHENG Yiming,YAO Jiangang.Application of Indirect Forecasting Method in Bus Load Forecasting[J].Power System Technology,2011,35(12):177-182.
Authors:YANG Licai  ZHANG Wenlei  ZHOU Yong  LIAO Feng  XU Chengzhuo  CHENG Yiming  YAO Jiangang
Affiliation:1(1.School of Electrical and Information Engineering,Hunan University,Changsha 410082,Hunan Province,China; 2.Hunan Electric Power Dispatch and Communication Bureau,Changsha 410007,Hunan Province,China; 3.Hunan HDWL Electric&Information TECH Co.,Ltd.,Changsha 410082,Hunan Province,China)
Abstract:To avoid the adverse effects of load transfer,power supply interruption and small power sources in 220 kV power supply region on bus load forecasting,a method to indirectly forecast bus load is proposed.Firstly,the bus-supplied load is transferred into ideal load located in the region supplied by this bus;then regarding this ideal load as historical load data,the bus load is forecasted by system load forecasting algorithm to attain preliminary forecasting result,meanwhile the values of influencing factors in the forecasted day are obtained;finally,discarding various values of influencing factors from the preliminary forecasting result,the bus-supplied load is indirectly forecasted.Case study results show that applying the proposed method to the bus load forecasting under the condition that there are small power sources in the bus-supplied region,the bus load forecasting results are much accurate than those forecasted by direct forecasting method in which the bus-supplied load is taken as historical load data.
Keywords:bus load forecasting  small power source  load transfer  bus-supplied load  indirect forecasting
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号