首页 | 本学科首页   官方微博 | 高级检索  
     

腈纶纱染色废水预处理工程的设计与运行
引用本文:蒋克彬,张小海.腈纶纱染色废水预处理工程的设计与运行[J].中国给水排水,2008,24(2):55-57.
作者姓名:蒋克彬  张小海
作者单位:宿迁市清源环境科学研究有限公司,江苏,宿迁,223800
摘    要:为使厂内处理水质达到接管标准,采用水解/塔式生物滤池和混凝沉淀工艺作为腈纶纱染色废水预处理工艺。工程运行表明,原水COD≤1600mg/L时,适当增大回流量,水解/塔式生物滤池对COD的去除率可达57%;再经混凝沉淀处理,可去除45%的COD,出水COD〈380mg/L,能满足接管要求。另外,出水色度、SS也优于接管标准。因此,采用上述工艺对腈纶纱印染废水进行预处理在技术上是可行的,经济上也是可以接受的(运行费用为1.82元/m^3)。

关 键 词:染色废水  预处理  水解  塔式生物滤池  混凝沉淀  腈纶纱  染色废水  处理工程  设计与运行  Dyeing  Wastewater  Yarn  Project  Pretreatment  Operation  运行费用  经济  预处理工艺  印染废水  出水色度  沉淀处理  去除率  回流量  原水  工程运行  沉淀工艺
文章编号:1000-4602(2008)02-0055-03
收稿时间:2007-07-02

Design and Operation of Pretreatment Project of Acrylon Yarn Dyeing Wastewater
JIANG Ke-bin,ZHANG Xiao-hai.Design and Operation of Pretreatment Project of Acrylon Yarn Dyeing Wastewater[J].China Water & Wastewater,2008,24(2):55-57.
Authors:JIANG Ke-bin  ZHANG Xiao-hai
Affiliation:JIANG Ke-bin,ZHANG Xiao-hai(Qingyuan Environmental Science Research Co.Ltd.,Suqian 223800,China)
Abstract:In order to meet the influent requirement of subsequent WWTP, hydrolysis/tower biological filter and coagulation sedimentation process were used to pretreat acrylon yarn dyeing wastewater. The operation indicates that when the raw wastewater COD is equal to or less than 1 600 mg/L, and the quantity of recycle is increases properly, the COD removal rate by hydrolysis/tower biological filter can reach 57%. After the treatment of coagulation sedimentation, the COD removal rate can reach 45% with the effluent COD of less than 380 mg/L, meeting the influent requirement. In addition, the effluent color and SS are superior to the influent requirement. In conclusion, the pretreatment of acrylon yarn dyeing wastewater by the processes above-mentioned is technically and economically feasible. The operation cost is 1.82 Yuan/m^3.
Keywords:dyeing wastewater  pretreatment  hydrolysis  tower biological filter  coagulation sedimentation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号