首页 | 本学科首页   官方微博 | 高级检索  
     

隧道长管棚超前支护施工工艺及其对钻机性能要求探讨
引用本文:夏邦瑶,代金旭,罗家详.隧道长管棚超前支护施工工艺及其对钻机性能要求探讨[J].探矿工程(岩土钻掘工程),2007,34(12):52-54.
作者姓名:夏邦瑶  代金旭  罗家详
作者单位:1. 浙江省中宇建设集团有限公司,浙江,衢州,324014
2. 贵阳探矿机械厂,贵州,贵阳,550003
摘    要:结合65m长管棚超前支护的施工实例,介绍了海王星-508型钻机在长管棚施工中采用的施工工艺,并探讨了长管棚施工对钻机的性能要求。

关 键 词:长管棚超前支护  隧道  软弱围岩  海王星-508型钻机
文章编号:1672-7428(2007)12-0052-03
收稿时间:2007-05-30
修稿时间:2007-08-17

Discussion on Construction Technology of Long Pipe-shed Pre-reinforcement for Tunnel and Feature Requirement of Drilling Machine
XIA Bang-yao,DAI Jin-xu,LUO Jia-xiang.Discussion on Construction Technology of Long Pipe-shed Pre-reinforcement for Tunnel and Feature Requirement of Drilling Machine[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2007,34(12):52-54.
Authors:XIA Bang-yao  DAI Jin-xu  LUO Jia-xiang
Abstract:With the construction case of 65 m long pipe-shed pre-reinforcement, the paper introduced the construction technology of long pipe-shed whh Haiwangxing - 508 drilling machine, and discussed the feature requirement of drilling machine in the construction.
Keywords:long pipe-shed pre-reinforcement  tunnel  soft surrounding rock  Haiwangxin- 508 drilling machine
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《探矿工程(岩土钻掘工程)》浏览原始摘要信息
点击此处可从《探矿工程(岩土钻掘工程)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号