Optimal Two-Stage Production Scheduling with Setup Times Separated |
| |
Authors: | Teruhiko Yoshida Katsundo Hitomi |
| |
Affiliation: | a Kobe University of Commerce, Taiumi, Kobe, Japanb Osaka University, |
| |
Abstract: | This paper considers the two-machine (-stage) flow-shop problem of minimizing the total elapsed time, where setup times are separated from processing times. A theorem which is an extension of Johnson's for the two-machine flow-shop problem with setup times included is developed for the optimal scheduling with setup times separated. A numerical example is shown in order to clarify the effect of setup time consideration on the reduction of the total elapsed time. |
| |
Keywords: | |
本文献已被 InformaWorld 等数据库收录! |
|