空冷岛的安装质量及进度控制
引用本文:杨护洲. 空冷岛的安装质量及进度控制[J]. 电力建设, 2007, 28(6): 0-0
作者姓名:杨护洲
作者单位:西北电力设计院,西安市,710075
摘    要:陕西神木阳光电厂工程空冷岛的安装质量控制主要是保证焊缝的施工质量和风机找平对中的质量, 进度控制就是确保施工节点不变。经过多方努力, 该工程最后如期完工, 并且质量优秀。

关 键 词:空冷岛  质量控制  进度控制
文章编号:1000-7229(2007)06-0071-03
收稿时间:2010-01-25
修稿时间:2007-01-13

Quality and Schedule Control of Air-Cooling Island Installation
YANG Hu-zhou. Quality and Schedule Control of Air-Cooling Island Installation[J]. Electric Power Construction, 2007, 28(6): 0-0
Authors:YANG Hu-zhou
Abstract:The installation quality of the air-cooling island, which is a turn-key project of Shenmu Yangguang Power Plant, is very important, and its schedule control is also very complicated. The key to installation quality control is to ensure weld and fan alignment qualities. The schedule control is to keep up with construction nodes. Through efforts from all participants, this project was completed on time and had an excellent quality.
Keywords:air-cooling island   quality control   schedule control