摘    要:阳泉煤业集团天安煤矿矿井排水系统由主斜井和副斜井井底水泵房组成,计算了主斜井井底水泵房排水系统能力为114万t/a,副斜井水泵房排水系统能力为154万t/a,经综合评定该矿井排水系统能力为114万t/a。

关 键 词:主斜井  副斜井  排水系统能力  计算

Comprehensive Evaluation on Drainage System in Tian'an Mine
YANG Hai-ping.Comprehensive Evaluation on Drainage System in Tian'an Mine[J].Shanxi Coal,2011,31(1):58-60,72.
Authors:YANG Hai-ping
Affiliation:YANG Hai-ping1,2(1.College of Mining Engineering,Taiyuan University of Technology,Taiyuan Shanxi 030024,China 2.Shanxi Coal Construction Supervision Co.,Taiyuan Shanxi 030012,China)
Abstract:The drainage system of Tian'an mine,Yangquan Coal Group,is composed of pump houses in the main inclined shaft and auxiliary inclined shaft.By calculation,the main shaft's drainage capacity is 1.14 million t/a,and the auxiliary 1.54 million t/a.Therefore,the comprehensive evaluation of the mine's drainage capacity is supposed to be 1.14 million t/a.
Keywords:main inclined shaft  auxiliary inclined shaft  drainage system capacity  calculation  